This lead state team has completed all planned activities and is no longer active. See the
closeout report for a summary of lead state team accomplishments. The information below, as created by the active lead state team, remains available for review by users seeking additional information. New Bridge Material Design OptionsWhat are the New Bridge Material Design Options?Two bridge-related technologies particularly well suited for remote or environmentally sensitive locations will be showcased by a single lead states team. These are:
Rigidified
FRP Arch Bridges - This technology offers particular advantage in environmentally sensitive areas and in locations where it isn't feasible to bring in heavy construction equipment.
RFRPAB structures are less expensive, longer lasting in severe exposure environments, and have a lower carbon footprint than many other bridge design options.
Hybrid Composite Bridges - Hybrid composite beams offer lighter weights, allowing placement with lighter construction equipment. They offer the possibility of longer-lived spans and corrosion resistance not offered in conventional materials.
Kenneth Sweeney, P.E. Chief Engineer Maine Department of Transportation 207-624-3011 Ken.sweeney@maine.gov | Dr. Tadeusz C. Alberski, Ph.D., P.E. Senior Civil Engineer
New York State Department of Transportation
518-457-5682 talberski@dot.state.ny.us | David Sherlock, P.E. Bridge Program Manager Maine Department of Transportation 207-624-3490 David.sherlock@maine.gov | Raja Jildeh, P.E. Michigan Department of Transportation 517-373-0736 jildehr@michigan.gov | Dale Peabody, P.E. Director, Transportation Research Maine Department of Transportation 207-624-3305 Dale.peabody@maine.gov | Mansour Mike Mohseni, P.E. Colorado Department of Transportation 303-512-4300 mansour.mohseni@dot.state.co.us | Stacy McMillan, P.E. Missouri Department of Transportation 573-526-0250 Stacy.mcmillan@modot.mo.gov | Christine Mizioch, P.E. Vice President Accelerated Project Delivery The Metric Group 617-778-1489 Christine.mizioch@themetricgroup.com | Larry Parent, P.E. Senior R&D Program Manager AEWC Advanced Structures and Composites Center
University of Maine 207-581-2718 Larry_Parent@umit.maine.edu | Louis N. Triandafilou, P.E. Senior Structural Engineer FHWA Office of Technical Services 410-962-3648 lou.triandafilou@dot.gov | |
Friends of the Team: Stephen Von Vogt, P.E. Executive Director Maine Composites Alliance 207-828-1414
svonvogt@mainecompositesalliance.org |
New Bridge Material Design Options Library- Fast-Fact Sheets
-
Factsheet
- Hand-Outs
- Presentations
- Other Publications
-
Case Studies
One-page fact sheets for bridge projects in: Pittsfield, Maine; Anson, Maine; Auburn, Maine; Bradley, Maine; Hermon, Maine; Belfast, Maine; Caribou, Maine; Fitchburg, Massachusetts; and Pinkham's Grant, New Hampshire. -
Fiber-reinforced Polymer (FRP) Fire Resistance Summary
Advanced Structures and Composites Center (May 2012) -
Field Installation Manual for Hybrid-Composite Beams
HCB, Inc. (2012) -
Hybrid-Composite Beam (HCB®) Design and Maintenance Manual
The Missouri Department of Transportation (August 2012)
- Additional Resources
-
Videos
-
Sample Public Interest Finding Documents
|
|